Plant engineering · Site tour · Beginner

A 1 MW Electrolyzer in Tallinn: Utilitas Case Study

Stargate Hydrogen8 minEnglish

Why watch it?

Stargate Hydrogen's own case study of the 1 MW electrolyzer at the Utilitas plant in Tallinn, described as the first turnkey green hydrogen electrolyzer system in the Baltics. It supplies high-purity hydrogen to fueling stations and feeds stack waste heat into the city's district heating network. A build time-lapse is followed by interviews with Aivo Lokk of Utilitas and Stargate staff, including CEO Marko Virkebau. This is supplier marketing, the electrolyzer technology is not specified, and technical depth is limited.

This introduction is based on the video’s YouTube description and catalogue details. Source video: independent technical information. No expert opinion has been added to this video yet.

What you will learn

The viewer can explain how a 1 MW electrolyzer plant supplies hydrogen to fueling stations while delivering stack waste heat to a district heating network.

Who is it for?

  • EngineerDesign, operation and system integration
  • IndustryDeployment, supply and plant decisions

Related videos

Take your hydrogen plant from feasibility to commissioning

Talk to the IPEC team about basic and detailed engineering, procurement, installation and commissioning.

Get in touch